注册 登录  
 加关注
   显示下一条  |  关闭
温馨提示!由于新浪微博认证机制调整,您的新浪微博帐号绑定已过期,请重新绑定!立即重新绑定新浪微博》  |  关闭

WenDa的共享空间

组合结构,钢结构,钢管混凝土,结构抗震,防灾减灾。记录生活中的点滴感悟!

 
 
 

日志

 
 

[转]PEER Tall Buildings Initiative-Task 8 – Input Ground Motions for Tall Buildings with Subterranean Levels  

2011-01-15 15:31:04|  分类: 结构抗震 |  标签: |举报 |字号 订阅

  下载LOFTER 我的照片书  |

Task 8 – Input Ground Motions for Tall Buildings with Subterranean Levels

引文来源  Task 8 – Input Ground Motions for Tall Buildings with Subterranean Levels | Tall Buildings Initiative

Task description – Prepare interim report describing the state of the art and practice for definition and input of ground motions for tall buildings with embedded foundations. Define additional needed studies as appropriate. Rely on past analytical and empirical studies. Work with experienced engineers familiar with tall building configurations and analysis procedures. Also, identify any other major issues to be investigated for foundation design of tall buildings.

Lead investigator – Jon Stewart

Team members – C.B. Crouse, M. Lew, F. Ostadaan, and E. Taciroglu.

Status - Completed

Task 8 Final Report

  评论这张
 
阅读(37)| 评论(0)
推荐 转载

历史上的今天

在LOFTER的更多文章

评论

<#--最新日志,群博日志--> <#--推荐日志--> <#--引用记录--> <#--博主推荐--> <#--随机阅读--> <#--首页推荐--> <#--历史上的今天--> <#--被推荐日志--> <#--上一篇,下一篇--> <#-- 热度 --> <#-- 网易新闻广告 --> <#--右边模块结构--> <#--评论模块结构--> <#--引用模块结构--> <#--博主发起的投票-->
 
 
 
 
 
 
 
 
 
 
 
 
 
 

页脚

网易公司版权所有 ©1997-2017