注册 登录  
 加关注
   显示下一条  |  关闭
温馨提示!由于新浪微博认证机制调整,您的新浪微博帐号绑定已过期,请重新绑定!立即重新绑定新浪微博》  |  关闭

WenDa的共享空间

组合结构,钢结构,钢管混凝土,结构抗震,防灾减灾。记录生活中的点滴感悟!

 
 
 

日志

 
 

[转]PEER Tall Buildings Initiative-Task 3 – Assessment of ground Motion Selection and Modification Procedures  

2011-01-15 15:22:58|  分类: 结构抗震 |  标签: |举报 |字号 订阅

  下载LOFTER 我的照片书  |

Task 3 – Assessment of ground Motion Selection and Modification Procedures

引文来源  Task 3 – Assessment of ground Motion Selection and Modification Procedures | Tall Buildings Initiative

Task description – Conduct analyses of multistory building models subjected to a large number of earthquake ground motions to determine the native statistics of the responses, compare results with results obtained using various proposed ground motion selection and modification procedures, and recommend appropriate ground motion selection and scaling procedures. Work to be conducted in coordination with the PEER working group on ground motion selection and scaling. Buildings models to include two core wall models (of different heights) and two frame models (of different heights). Building models preferably based on actual building projects, preferably the models (slightly modified) from the actual projects. Collect statistics on important design parameters including roof drift, interstory drift, floor accelerations, moment profiles, shear profiles, collector forces, etc. Identify ground motion parameters that correlate best with response quantities. Recommend selection and scaling procedures for design.

Lead investigator – Jack Moehle

Team members – John Hooper, Stephen Mahin, Tony Yang, Tea Visnjic

Status – Active

  评论这张
 
阅读(51)| 评论(0)
推荐 转载

历史上的今天

在LOFTER的更多文章

评论

<#--最新日志,群博日志--> <#--推荐日志--> <#--引用记录--> <#--博主推荐--> <#--随机阅读--> <#--首页推荐--> <#--历史上的今天--> <#--被推荐日志--> <#--上一篇,下一篇--> <#-- 热度 --> <#-- 网易新闻广告 --> <#--右边模块结构--> <#--评论模块结构--> <#--引用模块结构--> <#--博主发起的投票-->
 
 
 
 
 
 
 
 
 
 
 
 
 
 

页脚

网易公司版权所有 ©1997-2017